Tesla Flies in New Battery Production Line for Gigafactory
May 25th, 2018
Balls to the wall 24/7.
Besides the normal Model S and X and energy products output, there’s the Model 3 ramp, the single 50,000 unit Powerwall order from Australia, an as yet undisclosed 1+GWH battery project and the looming Semi.
I’ve been in the queue for a Powerwall 2 since December 2017. #learningpatiencewithtesla
Via: Reuters:
Tesla Inc has flown six planes full of robots and equipment from Europe to California in an unusual, high-stakes effort to speed up battery production for its Model 3 electric sedan, people familiar with the matter told Reuters this week.
Transporting equipment for a production line by air is costly and hardly ever done in the automotive industry, and the move underscores Tesla Chief Executive Elon Musk’s urgency to get a grip on manufacturing problems that have hobbled the launch of the high-volume Model 3 and pushed Tesla’s finances deep into the red.
“As usual with Tesla, everything is being done in a massive hurry and money seems to be no obstacle,� said one of the two sources.
Tesla on Friday declined to comment on whether it has shipped in any new production equipment from Europe.
<!–
–>
<!– AD CAN GO HERE
END: AD CAN GO HERE –>
Leave a Reply
You must be logged in to post a comment.
Source Article from http://www.cryptogon.com/?p=52855