Human error blamed for Fukushima meltdown

CATASTROPHIC meltdowns of reactors at the Fukushima Daiichi nuclear plant had less to do with the earthquake and tsunami that hit Japan on 11 March last year, and more to do with the plant owners’ and government’s failure to anticipate and prepare for emergencies on such an epic scale.

That’s according to a report by an independent panel commissioned by the Japanese government. Released on Monday, the report is the latest of several to surface, and accuses the Nuclear and Industrial Safety Agency of failing to tell the media that the plant’s fuel rods had possibly melted, even though it knew this was likely.

Meanwhile, the removal of the rods from a storage pool at the facility started last week. Images aired on TV showed cranes lifting two of the 1535 fuel units from the No 4 reactor building. This was the first stage of a programme to remove unused and used fuel from the reactor to counter the risk of further radiation leakage. The process could take years.


Issue 2875 of New Scientist magazine


print
send



If you would like to reuse any content from New Scientist, either in print or online, please contact the syndication department first for permission. New Scientist does not own rights to photos, but there are a variety of licensing options available for use of articles and graphics we own the copyright to.

Have your say

Only subscribers may leave comments on this article. Please log in.

Only personal subscribers may leave comments on this article

Subscribe now to comment.

All comments should respect the New Scientist House Rules. If you think a particular comment breaks these rules then please use the “Report” link in that comment to report it to us.

If you are having a technical problem posting a comment, please contact technical support.

You can skip to the end and leave a response. Pinging is currently not allowed.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes